Sustainability Reporting Software for Nigeria | Emvert

Sustainability reporting software,
built for Nigeria.

Emvert turns scattered utility bills, generator logs and fuel records into FRC- and SEC-ready disclosures, with grid and generator counted separately, evidence on every figure, and billing in Naira.

  • About 50% less reporting time (Environmental Managers Consult, two engagements)
  • Evidence on every figure
  • Billed in Naira

Reports mapped to the frameworks your regulators ask for

Why local matters

A Lagos plant does not emit
like a Frankfurt one.

Foreign carbon platforms are excellent software built for a different set of facts. Run a Nigerian reporting cycle through one and the arithmetic is wrong before anyone reviews it.

Emission factors

ForeignUS and EU grid factors

EmvertGrid, generators and vehicles counted separately

Report structure

ForeignUS SEC, CSRD, SASB

EmvertFRC and SEC Nigeria, aligned to ISSB S1 & S2

Pricing

ForeignOften invoiced in USD

EmvertAnnual tiers in Naira

Support

ForeignNever filed in Nigeria

EmvertKnow the FRC guideline, in your working day

Emvert vs foreign platforms Emvert vs consultants

Emvert scores your disclosure against the framework you actually file under, and tells you which gaps to close first.

The clock

The dates are already set.

A sustainability disclosure reports on a completed financial year. The first mandatory report is written from the data you are collecting today — which is why the useful deadline is not the filing date, it is now.

  1. 2027

    FRC · Readiness test

    Before your first report, the FRC requires a three-stage readiness test. Stage 1 (a board resolution, a gap analysis and an implementation plan) is due three months before your first mandatory period starts.

    See the readiness test dates
  2. 2028

    FRC and SEC · Public interest entities

    Public interest entities report for periods beginning on or after 1 January 2028. That includes every public company, regulated companies and any company with turnover of ₦30 billion or more.

    Read the FRC requirement
  3. 2030

    SMEs · Small & medium enterprises

    Smaller companies follow, often pulled in earlier than the date by the Scope 3 requests of the listed customers and banks they supply.

    Read the SMEs requirement

Reconstructing a year of meter readings and fuel receipts after the fact is the single most expensive part of a first reporting cycle.

Built for your role

Whoever owns the report, Emvert carries the weight.

Five people sign off a sustainability disclosure and each one is afraid of something different. Pick yours.

{{ persona.role }}

{{ personaIndex }}

{{ persona.title }}

The fear: {{ persona.fear }}

{{ persona.answer }}

  • {{ point }}

{{ persona.metricValue }}

{{ persona.metricLabel }}

See how Emvert helps

How it works

From scattered records to a filed report.

Four stages, one system, one set of numbers. What you put in at the start is what an auditor can trace at the end.

  1. CollectRecords in01
  2. CalculateEmissions out02
  3. ReportRegulator structure03
  4. EvidenceAudit trail04

Collect

One intake for every emissions record

Bills, generator logs and fuel receipts get one structured home per site, with gaps flagged before they become a problem.

  • Energy, fuel and activity data
  • Evidence at entry
  • Validation flags
Carbon accounting

Calculate

Grid and generator, counted separately

Every generator, vehicle and machine is recorded by fuel type, counting fuel burned rather than bought, and traced to the factor and version behind it.

  • By fuel type
  • Scope 1 & Scope 2
  • Scope 3 in development

Report

Written in the structure the regulator expects

Figures map into FRC and SEC Nigeria structures, aligned to ISSB S1 & S2 and GRI. IFRS S2 now carries the TCFD recommendations in full.

  • FRC & SEC Nigeria
  • ISSB S1 & S2 · GRI · TCFD
  • Board-ready exports
ESG reporting

Evidence

Every number carries its source

Each figure resolves to its meter reading, invoice or fuel log, with who entered it and when. Four clicks, not four days.

  • Figure-level evidence
  • Change history
  • Assurance-ready export
Assurance & audit

In practice

Environmental Managers Consult Limited

Environmental consultancy

About 50%less reporting time across two engagements

Working with Emvert has helped us organise the information we collect from clients and keep track of who is responsible for providing it. Across two client engagements, we saw reporting time reduce by approximately half at the data collection and report preparation stages. This allows us to spend less time coordinating information manually and more time focusing on the quality and interpretation of the results.

Read the case study

EnvGreen Africa

First engagement on Emvert

Board-readyESG readiness assessment for a client

Using Emvert for the first time, EnvGreen deepened its understanding of ESG compliance and finalised a readiness assessment for a client, presented to the client’s board to agree the next line of action.

  • Gaps identified
  • Implementation plan
  • Executive summary
Read the case study

Questions

Answered plainly

Written for someone filing for the first time. Every term is defined where it is used.

All frequently asked questions

{{ f.answer }}

{{ f.linkLabel }}