Process emissions: the category manufacturers miss.

A cement producer reporting only fuel and electricity has omitted a source that frequently exceeds the fuel used to drive the kiln.
4 min read
Published August 2026
Reviewed September 2026

Most emissions come from burning something. Process emissions do not — they come from a chemical reaction, and they would occur even if the reaction were driven by an entirely clean energy source.

The clearest example is cement. Making clinker requires heating limestone until it decomposes into lime and carbon dioxide. That CO₂ is released by the chemistry, not by the fuel, and in cement production it frequently exceeds the emissions from the fuel used to reach the temperature.

Industries that should check

  • Cement and limeCalcination. Usually the largest single source in the inventory.
  • Glass and ceramicsCarbonate decomposition during melting and firing.
  • Chemicals and fertiliserAmmonia production and a range of other reactions release CO₂ directly.
  • Iron, steel and aluminiumReduction processes, and carbon consumed as a reagent rather than a fuel.
  • Food and beverageFermentation, and CO₂ used in carbonation where it is not recovered.

The tell

The tell

If your disclosure’s Scope 1 consists entirely of fuel lines and your process chemically releases CO₂, something is missing. This is the first thing a sector-literate reviewer checks, and it is one of the few omissions that is obvious from the outside.

How it is measured

Not from fuel. Process emissions are calculated from production volumes and the chemistry: quantity of raw material consumed, multiplied by a factor derived from the stoichiometry of the reaction, with adjustments for material composition and for any CO₂ recovered rather than released.

The IPCC national inventory guidelines set out the methodology for the main industrial processes, and it is the standard reference for corporate inventories too. It also means you need production and raw material data in the same system as your energy data — which is the same requirement CBAM imposes on exporters of covered goods, so the work serves twice.

Questions

Check this yourself

A summary of a regulation is not the regulation. These are the primary documents this page is based on.

SEC 2027 · 105 days

File with confidence, before the deadline files you.

Companies that start now collect a full clean year before they ever have to file. Companies that start late reconstruct one — and that is the expensive part.

Check your deadline

Four questions, and you get the year you first file, the framework, and what to collect first.

Read the requirement

Plain-language explainers of the FRC and SEC rules, ISSB S1 & S2, and what each asks you to disclose.

Compare the cost

What a consultant-led reporting cycle costs against an annual licence, in Naira.