Manufacturing

Grid for part of the day, diesel for the rest.

For most Nigerian plants the split between purchased power and on-site generation is the single biggest determinant of the reported footprint — and it is the thing global platforms get wrong.
Scope 1 driver

On-site generation

Scope 2 driver

Grid supply

Often material

Process emissions

Export risk

CBAM for covered goods

8 min read

Why the split moves your numbers so much

Consider two identical plants consuming the same total electricity. The first draws it all from the grid. The second draws half and generates the rest on diesel.

The first reports a clean Scope 2 figure and almost nothing in Scope 1. The second reports half that Scope 2, plus a substantial Scope 1 figure at a completely different emission factor — and, because diesel generation is considerably more carbon-intensive per unit of electricity than most grid supply, a higher total.

Those are not small differences. For a plant running significant generation, the split determines both the size of the footprint and where it sits in the disclosure. And a platform that assumes continuous grid supply will never ask the question — it will take your kilowatt-hours, apply a grid factor, and report a number that is internally consistent and wrong.

This is the clearest single example of why factor sets and data models built for other markets fail here. The arithmetic is not harder. The question is different.

The sources to measure

  • Grid electricity, per siteMetered consumption from your DisCo bills. Where a regional factor is more accurate than the national average and the data supports it, use it and record why.
  • On-site generation fuelLitres per generator, per period, from delivery notes and fuel logs. Measure fuel rather than output wherever possible — fuel is metered and defensible, output is usually estimated.
  • Process emissionsEmissions from chemical reactions rather than combustion. Calcination in cement production is the classic case and is frequently larger than the fuel used to drive the kiln. If your process releases CO₂ chemically, it belongs in Scope 1 and is often missed entirely.
  • Thermal fuelsGas, LPG or heavy fuel oil for boilers, kilns, dryers and furnaces, separately from generation.
  • RefrigerantsFugitive releases from cooling and chilling. Usually immaterial and occasionally not, particularly in food and beverage operations.
  • Inbound and outbound logisticsScope 3 categories 4 and 9. In a country with long inland distances and fragmented road freight, these are often more material than they would be elsewhere.

Process emissions are the commonest omission

Multi-site is a workflow problem

A group running six plants and a dozen depots does not have a harder measurement problem than one running a single site. It has a harder collection problem: twenty separate sets of readings arriving at twenty different levels of reliability, on a monthly cycle, from people whose primary job is production.

Central spreadsheets fail at this reliably. The failure is not technical — it is that the sustainability lead becomes the single point through which every figure must pass, and they cannot chase twenty sites and also do the analysis.

Structured intake moves entry to the site and leaves the centre reviewing status. That is the difference between a cycle that closes and one that runs three months late every year.

If you export to the EU

Cement, iron and steel, aluminium and fertilisers are on the CBAM list. If you export any of them into the EU, your buyer has a declaration obligation and will pass a data request to you — typically well before any Nigerian mandate reaches you.

What they need is emissions embedded per tonne of product from a specific installation, which requires production volumes alongside energy and process data and a documented allocation across grades and outputs. Start capturing production volumes in the same system as the energy data and the allocation becomes arithmetic rather than a project.

Questions

We meter fuel at the site, not per generator. Is that enough?

For a total it is workable. For anything useful it is not: site-level fuel hides which unit is inefficient, makes maintenance decisions invisible, and gives you nothing to act on. Per-generator metering is a modest cost and it is where the operational savings come from.

How do we handle a captive power plant?

Fuel into a captive plant you own and operate is Scope 1, and the electricity it produces is not purchased so it never enters Scope 2. If you export surplus power to a third party there are allocation questions — take advice, and document the treatment.

Should we report emissions intensity per tonne of product?

Yes, and for manufacturers it is usually the more useful figure. Absolute emissions rise with production; intensity shows whether you are actually getting more efficient. It is also what CBAM effectively asks for, so you are building it anyway.

Our plant runs at very variable utilisation. Does that distort things?

It distorts intensity in both directions, and you should say so. Disclosing utilisation alongside intensity lets a reader separate an efficiency improvement from a demand change — and stops you claiming credit for a downturn.

Check this yourself

A summary of a regulation is not the regulation. These are the primary documents this page is based on.

The Greenhouse Gas Protocol Corporate StandardWorld Resources Institute and WBCSDIncluding the treatment of process emissions and consolidation approaches.
IPCC Guidelines for National Greenhouse Gas InventoriesIntergovernmental Panel on Climate ChangeThe underlying source for process emission methodologies including cement calcination.
SEC 2027 · 105 days

File with confidence, before the deadline files you.

Companies that start now collect a full clean year before they ever have to file. Companies that start late reconstruct one — and that is the expensive part.

Check your deadline

Four questions, and you get the year you first file, the framework, and what to collect first.

Read the requirement